Performance results
2025 Pollution and Resource Management Performance Summary
Through the continuous implementation of its Green Process policy, the Company has consolidated the outcomes of its pollution and resource reduction initiatives across all operational dimensions, as summarized below.
| Sources of Pollution and Resource Reduction | Project Scope | Reduction Achieved / Results |
|---|---|---|
| 1. Through Advanced Pollution Control Technologies |
Air: Installed dust collection systems (Multi-Cyclone, Wet Scrubber, and Bag Filter) and odor control systems. Water: Treated wastewater using the Activated Sludge (AS) system and recirculated water within the cooling system. |
Reduced Water Intensity 31.1% Air Emissions and Wastewater Quality Complied with Regulatory Standards 100% Zero Odor Complaints |
| 2. Through Circular Economy and Zero Waste Initiatives |
Implemented projects based on the 3Rs principles (Reduce, Reuse, Recycle). Upcycling: Converted used noodle packaging into recycled composite boards. Take-back: Collected and returned film cores and sauce containers for reuse, and returned red plastic bags to manufacturers for recycling. |
Reduced Waste Intensity 0.35% Volume of Waste Recycled or Recirculated 14,437.47 tons Towards Zero Waste to Landfill by 2030 |
| 3. Through Energy Management and Climate Change Strategies |
Production Efficiency and Clean Energy Implemented frying optimization to improve process efficiency and applied a Steam Ejector system to reduce steam consumption. Generated renewable electricity from solar energy to replace grid electricity consumption. Implemented preventive maintenance practices to reduce energy losses and improve operational efficiency. |
Reduced Energy Consumption 18.4% Greenhouse Gas Emissions Reduced 3,858.8 tCO2e / Year (Equivalent to planting 385,880 trees)* |
Water Consumption Reduction Summary
Through the continuous implementation of its Green Process policy, the Company has consolidated the outcomes of its pollution and resource reduction initiatives across all operational dimensions, as summarized below.
| Water Management Strategy | Project Scope and Key Measures | Outcomes and Benefits |
|---|---|---|
| 1. Water Reduction at Source Focusing on machinery and workflow optimization to minimize water usage while maximizing purity. |
• High-Pressure Water: Replacing hoses with high-pressure water washers in the noodle production lines. • Spray Nozzle: Replacing perforated pipes with spray nozzles in the noodle conveyor and filtration systems to improve water distribution and efficiency. • Automated Systems: Installing roller soaking tubs instead of continuous spraying, and implementing automated screen washing systems (using non-hazardous chemical alternatives instead of water/steam). |
Reduction in Water Consumption per Unit of Product 31.1% Production efficiency: Reduced cleaning and maintenance downtime. Reduction in wastewater sent for treatment. |
| 2. Water Recirculation and Reuse Reusing treated water or utility wastewater to maximize cost-efficiency and value. |
• Reusing treated wastewater for non-contact activities, such as watering green spaces, flushing toilets, and operating odor scrubber systems. • RO Reject and Process Wastewater Recovery Project • Steam Condensate Recovery Project for Boiler Feedwater |
Reduction in freshwater withdrawal from natural sources Reduction in municipal and groundwater consumption Energy savings Maximizing energy efficiency by recovering high-temperature condensate, reducing the fuel required to heat boiler feedwater. |
| 3. Continuous Efficiency Improvement Systemic Management, Scaling, and Governance |
• Water Consumption Tracking: Reporting water use by category at working committee meetings and monitoring wastewater treatment system performance monthly. • Scaling successful initiatives from the pilot plant to other branches, such as implementing water recycling at the Lamphun branch and steam condensate recovery at the Rayong branch. • Future Initiative: Water reduction equipment upgrade for noodle steamers (Ban Pong 1 Plant) |
Sustainable Management • Establishing an accurate water consumption database for advanced analytics. • Standardizing practices to ensure operational consistency across all plants. |
2025 Greenhouse Gas (GHG) Reduction Performance Summary
Through the continuous implementation of its Green Process policy, the Company has consolidated the outcomes of its pollution and resource reduction initiatives across all operational dimensions, as summarized below.
| Sources of Decarbonization | Consolidated Initiatives | GHG Emissions Reduced (tons $CO_2e$/year) |
|---|---|---|
| 1. Transition to Clean Energy | Aggregated Performance of All Solar Rooftop Phases and Biomass Fuel Pilots | 3,195.8 |
| 2. Upgrading Equipment Efficiency | Aggregated Savings from System-Wide Equipment Upgrades:
| 304.5 |
| 3. Loss and Waste Management | Aggregated energy loss reduction in production processes (waste heat, steam, and compressed air leaks) via automated control systems. | 358.48 |
| Total Combined Performance | • Comprehensive Scope: Covering all manufacturing plants and corporate offices. | 3,858.8 |
Organizational Greenhouse Gas Emissions Inventory
| areas | Scope | Greenhouse Gas Emissions (ton CO₂e) | |||
|---|---|---|---|---|---|
| 2022 | 2023 | 2024 | 2025 | ||
| Head Office | scope 1 | 116 | 126 | 132 | 244 |
| scope 2 | 443 | 463 | 537 | 503 | |
| scope 3 | 102 | 107 | 123 | 115 | |
| Chonburi Plant | scope 1 | 1,591 | 1,732 | 1,792 | 1,549 |
| scope 2 | 52,307 | 49,142 | 38,300 | 37,316 | |
| scope 3 | 18,929 | 17,608 | 11,148 | 103,960 | |
| Lamphun Plant | scope 1 | 1,344 | 1,523 | 1,175 | 1,297 |
| scope 2 | 4,739 | 4,979 | 5,471 | 4,517 | |
| scope 3 | 2,466 | 2,640 | 1,302 | 62,208 | |
| Rayong Plant | scope 1 | 14,229 | 12,655 | 13,286 | 12,628 |
| scope 2 | 7,427 | 6,954 | 7,588 | 7,106 | |
| scope 3 | 2,753 | 2,136 | 2,305 | 55,569 | |
| Ratchaburi Plant 1 | scope 1 | 10,685 | 9,675 | 9,838 | 9,625 |
| scope 2 | 1,299 | 1,181 | 1,258 | 1,230 | |
| scope 3 | 960 | 863 | 882 | 20,892 | |
| Ratchaburi Plant 2 | scope 1 | 16,098 | 14,225 | 12,782 | 11,552 |
| scope 2 | 3,883 | 3,774 | 3,868 | 3,396 | |
| scope 3 | 1,919 | 1,769 | 1,761 | 35,304 | |
| total | scope 1 | 44,063 | 39,936 | 39,005 | 36,895 |
| scope 2 | 70,098 | 66,493 | 57,022 | 54,068 | |
| scope 3 | 27,129 | 25,123 | 17,521 | 278,048 | |
| total | Scope 1 + 2 Emissions | 114,161 | 106,429 | 96,027 | 90,963 |
| total | Scope 1 + 2 + 3 Emissions | 141,290 | 131,552 | 113,548 | 369,011 |
| Scope 1 + 2 Carbon Intensity (tons CO_2e/ton of product) | 0.652 | 0.617 | 0.456 | 0.444 | |
Total Energy Consumption 2025
Unit: Gigajoules (GJ)
| Energy Types | Head Office | Chonburi Plant | Lamphun Plant | Rayong Plant | Ratchaburi Plant 1 | Ratchaburi Plant 2 | total |
|---|---|---|---|---|---|---|---|
| Non-Renewable Energy Consumption | |||||||
| Coal | - | - | - | - | 92,378.52 | 110,581.94 | 202,960.46 |
| Fuel Oil / Heavy Fuel Oil (HFO) | - | - | - | - | 2,163.07 | 1,898.88 | 4,061.95 |
| Diesel / Diesel Fuel | - | 1,427.41 | 235.61 | 1,515.25 | 1,196.14 | 817.87 | 5,192.29 |
| LPG | - | 7,101.85 | 3,090.50 | 553.33 | 286.31 | 7,347.95 | 18,379.94 |
| NG | - | - | - | 48,926.98 | - | - | 48,926.98 |
| Renewable Energy Consumption | |||||||
| Solar energy | - | 6,774.07 | 8,268.22 | 11,336.40 | 3,426.37 | 6,963.74 | 36,768.80 |
| Energy Consumption by Source / Fuel Type | |||||||
| Purchased Electricity / Grid Electricity | 3,621.93 | 43,216.28 | 24,581.24 | 46,158.62 | 8,290.60 | 24,454.08 | 150,322.75 |
| Steam Consumption / Steam Usage | - | 419,690.33 | 248,309.50 | 158,214.79 | - | - | 826,214.62 |
| total | 3,621.93 | 478,209.94 | 284,485.07 | 266,705.38 | 107,741.03 | 152,064.46 | 1,292,827.80 |
Energy Intensity
Unit: Megajoules per Kilogram of Product (MJ/kg of product)
| year | Energy Intensity Index (MJ/kg of product) |
|---|---|
| 2563 | 7.20 |
| 2564 | 6.94 |
| 2565 | 7.31 |
| 2566 | 6.02 |
| 2567 | 5.96 |
| 2568 | 5.80 |
Fuel Consumption (by Location and Type)
| areas | Fuel / Fuel Type | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Head Office | Vehicle Fuel Consumption (Liters) | 47,557.60 | 51,153.34 | 53,507.63 | 50,951.76 |
| Chonburi Plant | LPG (kg.) | 99,463 | 133,540 | 141,188 | 141,386.62 |
| Diesel / Diesel Fuel (liters) | 40,147 | 39,790 | 42,526 | 39,193.14 | |
| Lamphun Plant | LPG (kg.) | 53,000 | 55,680 | 48,560 | 61,527.00 |
| Diesel / Diesel Fuel (liters) | 7,363 | 5,808 | 7,645 | 6,469.24 | |
| Rayong Plant | LPG (kg.) | 10,138 | 9,951 | 10,695 | 11,016.00 |
| NG (kg.) | 1,119,426 | 976,738 | 1,034,907 | 956,594.90 | |
| Diesel / Diesel Fuel (liters) | 36,264 | 49,212 | 49,833 | 41,605.00 | |
| Ratchaburi Plant 1 | LPG (kg.) | 7,080 | 6,660 | 6,630 | 5,700.00 |
| Coal (tons) | 5,440 | 4,951 | 5,006 | 4,972.78 | |
| Fuel Oil / Heavy Fuel Oil (HFO) (Liters) | 129,100 | 87,400 | 68,600 | 52,400.00 | |
| Diesel / Diesel Fuel (liters) | 13,830 | 13,628 | 26,014 | 32,843.74 | |
| Ratchaburi Plant 2 | LPG (kg.) | 121,443 | 125,407 | 131,844 | 146,286.00 |
| Coal (tons) | 8,362 | 7,561 | 6,340 | 6,171.04 | |
| Fuel Oil / Heavy Fuel Oil (HFO) (Liters) | 124,000 | 8,500 | 351,500 | 46,000.00 | |
| Diesel / Diesel Fuel (liters) | 35,861 | 25,375 | 23,111 | 22,456.62 | |
| total | LPG (kg.) | 291,124 | 331,238 | 338,917 | 365,915.62 |
| NG (kg.) | 1,119,426 | 976,738 | 1,034,907 | 956,594.90 | |
| Coal (tons) | 13,803 | 12,511 | 11,346 | 11,143.82 | |
| Fuel Oil / Heavy Fuel Oil (HFO) (Liters) | 253,100 | 95,900 | 420,100 | 98,400.00 | |
| Diesel / Diesel Fuel (liters) | 181,022 | 184,966 | 202,637 | 193,519.49 |
Electricity Consumption
Unit: Kilowatt-hours (kWh)
| areas | type | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Head Office | Purchased Electricity Volume / Electricity Purchased | 1,077,000 | 1,141,000 | 1,074,207 | 1,006,092 |
| Chonburi Plant | Purchased Electricity Volume / Electricity Purchased | 13,010,361 | 12,845,084 | 14,319,108 | 12,004,522 |
| Solar energy | 1,305,338 | 1,345,388 | 1,347,621 | 1,881,686 | |
| Lamphun Plant | Purchased Electricity Volume / Electricity Purchased | 6,758,623 | 7,184,779 | 8,512,757 | 6,828,121 |
| Solar energy | 1,042,723 | 1,119,782 | 1,148,590 | 2,296,729 | |
| Rayong Plant | Purchased Electricity Volume / Electricity Purchased | 14,855,547 | 13,910,518 | 15,177,546 | 12,821,839 |
| Solar energy | 492,091 | 1,196,829 | 1,210,496 | 3,149,000 | |
| Ratchaburi Plant 1 | Purchased Electricity Volume / Electricity Purchased | 2,403,756 | 2,158,320 | 2,332,788 | 2,302,944 |
| Solar energy | 1,065,251 | 1,050,601 | 1,087,683 | 951,980 | |
| Ratchaburi Plant 2 | Purchased Electricity Volume / Electricity Purchased | 7,765,840 | 7,548,720 | 7,736,160 | 6,792,800 |
| Solar energy | 1,326,795 | 1,328,604 | 1,314,098 | 1,934,373 | |
| total | Purchased Electricity Volume / Electricity Purchased | 45,871,127 | 44,788,421 | 49,152,565 | 41,756,319 |
| Solar energy | 5,232,198 | 6,041,204 | 6,108,488 | 10,213,769 | |
| total | Total Electricity Consumption | 51,103,325 | 50,829,625 | 55,261,054 | 51,970,087 |
Air Quality Monitoring Results 1 — Chonburi Factory
Air Emission Monitoring Report 2025
| Monitored Parameters | Monitoring Results | Regulatory Standard |
|---|---|---|
| Total Suspended Particulate (TSP) — Unit: $mg/m^3$ | ||
| Stack — Cooker-Dryer Odor Scrubber | 4.2 | ≤400 |
| Stack — Mixing Room Odor Scrubber (No.1) | 0.4 | ≤400 |
| Stack — Mixing Room Odor Scrubber (No.2) | 0.2 | ≤400 |
| Stack — Grinder Odor Scrubber | 0.3 | ≤400 |
| Stack — Instant Noodle Fryer Line B | 5.3 | ≤400 |
| Stack — Instant Noodle Fryer Line D | 1.5 | ≤400 |
| Stack — Instant Noodle Fryer Line E | 4.7 | ≤400 |
| Stack — Instant Noodle Fryer Line F | 2.0 | ≤400 |
| Sulfuric Acid (H_2SO_4) — Unit: PPM | ||
| Exhaust system for routine laboratory fume hoods | 0.36 | 25 |
| Exhaust system for analytical laboratory fume hoods | 0.23 | 25 |
| Hydrochloric acid (HCl) — Unit: mg/m³ | ||
| Exhaust system for routine laboratory fume hoods | 0.25 | 200 |
| Exhaust system for analytical laboratory fume hoods | 0.21 | 200 |
Air quality monitoring results 2 — Lamphun Plant
| Monitored Parameters | Monitoring Results | Regulatory Standard |
|---|---|---|
| Total Suspended Particulate (TSP) — Unit: $mg/m^3$ | ||
| Odour scrubber stack | 5.4 | ≤400 |
| Exhaust stack — Noodle Department Phase 1 | 0.6 | ≤400 |
| Exhaust stack — Noodle Department 3 Phase 1 | 2.2 | ≤400 |
| Exhaust stack — Noodle Department 3 Phase 2 | <0.5 | ≤400 |
| Oil mist exhaust stack — Frying Department | 1.7 | ≤320 |
| Noodle frying pan exhaust stack — Phase 2 | 16.7 | ≤400 |
| Exhaust stack — Weighing Room, Raw Material Warehouse (1) | <0.5 | ≤400 |
| Exhaust stack — Weighing Room, Raw Material Warehouse (2) | <0.5 | ≤400 |
| Sulfuric Acid (H_2SO_4) — Unit: PPM | ||
| Exhaust hood stack — Quality Assurance Department | <0.01 | ≤25 |
| Nitrogen oxides (\text{NO}_x) as \text{NO}_2 — Unit: PPM | ||
| Oil mist exhaust stack | <1.0 | ≤200 |
| Sulfur dioxide (\text{SO}_2) — Unit: PPM | ||
| Oil mist exhaust stack | <1.0 | ≤60 |
Air quality monitoring results 3 — Rayong and Ratchaburi 1 & 2 Plants
| Monitored Parameters | Monitoring Results | Regulatory Standard |
|---|---|---|
| Total Suspended Particulate (TSP) — Unit: $mg/m^3$ | ||
| Odour scrubber stack 1 | 0.7 | ≤400 |
| Odour scrubber stack 2 | 0.7 | ≤400 |
| Odour scrubber stack 3 | 0.4 | ≤400 |
| Raw material exhaust stack No.1 / No.2 (Allergen) | 0.1–0.2 | ≤400 |
| - Boiler Stack 15 Tons | 0.4 | ≤320 |
| - Boiler Stack 10 Tons | 0.1 | ≤320 |
| Sulfur dioxide (\text{SO}_2) — Unit: PPM | ||
| Seasoning frying pan exhaust stack 1 & 2 | <1.3 | ≤500 |
| Exhaust stack — DSM Bread Oven / Wafer Ovens 1–4 | <1.3 | ≤60 |
| - Boiler Stack 15 / 10 Tons | <1.3 | ≤60 |
| Nitrogen oxides (\text{NO}_x) as \text{NO}_2 — Unit: PPM | ||
| Seasoning frying pan / Oven exhaust stack | <1.0 | ≤200 |
| - Boiler Stack 15 Tons | 19.6 | ≤200 |
| - Boiler Stack 10 Tons | 11.5 | ≤200 |
| Carbon monoxide (\text{CO}) — Unit: PPM | ||
| Seasoning frying pan exhaust stack 1 & 2 | ≤1.4 | ≤870 |
| Exhaust stack — DSM Bread Oven Line | 3.7 | ≤690 |
| - Boiler Stack 15 / 10 Tons | 0.2–0.3 | ≤690 |
| Monitored Parameters | Monitoring Results | Regulatory Standard |
|---|---|---|
| Total Suspended Particulate (TSP) — Unit: $mg/m^3$ | ||
| - Silo stack No.1 / No.2 / No.3 / No.4 | 2.1–10.0 | ≤400 |
| - Boiler NO.1 (BP1) Coal 6 Tons | 170.0 | ≤320 |
| - Boiler No.2 (BP1) Heavy oil 10 Tons | 57.5 | ≤240 |
| - Boiler NO.3 (BP2) Coal 16 Tons | 51.0 | ≤320 |
| - Boiler No.2 (BP2) Heavy oil 10 Tons | 26.0 | ≤240 |
| LPG exhaust stack — Rice Boiling Building | 1.0 | ≤320 |
| Sulfur dioxide (\text{SO}_2) — Unit: PPM | ||
| - Boiler NO.1 (BP1) Coal 6 Tons | 1.3 | ≤700 |
| - Boiler No.2 (BP1) Heavy oil 10 Tons | 734.5 | ≤950 |
| - Boiler NO.3 (BP2) Coal 16 Tons | 10.0 | ≤700 |
| - Boiler No.2 (BP2) Heavy oil 10 Tons | 703.0 | ≤950 |
| Carbon monoxide (\text{CO}) — Unit: PPM | ||
| - Boiler NO.1 Coal / NO.3 Coal | 131 / 311 | ≤690 |
| - Boiler Heavy oil BP1 / BP2 | 4.9 / 1.6 | ≤690 |
| LPG exhaust stack — Rice Boiling Building | 7.0 | ≤690 |
| Nitrogen oxides (\text{NO}_x) as \text{NO}_2 — Unit: PPM | ||
| - Boiler NO.1 Coal / NO.3 Coal | 183 / 155 | ≤400 |
| - Boiler Heavy oil BP1 / BP2 | 169 / 170.5 | ≤200 |
| LPG exhaust stack — Rice Boiling Building | 4.1 | ≤200 |
Total waste volume (by location)
Unit: Kilograms
| areas | Waste type | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|
| Head Office | Non-hazardous waste | ND | ND | ND | 24,350 |
| hazardous waste | 20 | 40 | 0 | 0 | |
| Chonburi Plant | Non-hazardous waste | 1,590,651 | 2,804,035 | 4,631,370 | 4,988,360 |
| hazardous waste | 2,983 | 2,718 | 0 | 2,406 | |
| Lamphun Plant | Non-hazardous waste | 1,767,645 | 3,694,830 | 3,920,434 | 4,104,513 |
| hazardous waste | 250 | 1,050 | 1,108 | 3,915 | |
| Rayong Plant | Non-hazardous waste | 1,061,119 | 3,214,800 | 3,103,350 | 3,748,710 |
| hazardous waste | 3,081 | 2,480 | 4,990 | 4,140 | |
| Ratchaburi Plant 1 | Non-hazardous waste | 636,424 | 637,083 | 649,059 | 741,299 |
| hazardous waste | 0 | 3,760 | 0 | 9,153 | |
| Ratchaburi Plant 2 | Non-hazardous waste | 995,461 | 939,314 | 930,187 | 825,911 |
| hazardous waste | 0 | 7,310 | 0 | 9,067 | |
| total | Non-hazardous waste | 6,051,300 | 11,290,062 | 13,234,400 | 14,433,143 |
| hazardous waste | 6,334 | 17,358 | 6,098 | 28,681 | |
| total | Total waste volume | 6,057,634 | 11,307,420 | 13,240,498 | 14,461,824 |
Waste Statistics
| year | Non-hazardous waste | Hazardous waste | Recycled / Reutilized | Landfilled | ||||
|---|---|---|---|---|---|---|---|---|
| Tons | Percentage | Tons | Percentage | Tons | Percentage | Tons | Percentage | |
| 2023 | 12,514.94 | 99.86% | 17.12 | 0.14% | 11,254.33 | 89.80% | 1,277.73 | 10.20% |
| 2024 | 13,234.41 | 99.95% | 6.10 | 0.05% | 13,232.90 | 99.94% | 7.61 | 0.06% |
| 2025 | 14,408.79 | 99.80% | 28.68 | 0.20% | 14,437.47 | 100% | 0 | 0% |
Non-Hazardous Waste Generation 1
| Waste type | Head office | Chonburi | Lamphun | Rayong | Ratchaburi Plant 1 | Ratchaburi Plant 2 | Management method | Responsible Party: |
|---|---|---|---|---|---|---|---|---|
| General waste from Headquarters | ||||||||
| Recyclable waste | 16.63 | - | - | - | - | - | Sold for recycling | - |
| Food waste | 5.54 | - | - | - | - | - | Disposed of by BMA (Bangkok Metropolitan Administration) | - |
| General waste | 2.18 | - | - | - | - | - | City Waste Collection | - |
| Industrial waste | ||||||||
| Noodle Scrap Flour Residue Starch Sediment | - | 503.68 | 709.46 | 766.57 | 217.51 | 627.87 | Animal Feed (084) / Soil Conditioner (083) | ✓ |
| Plant Tissue Scraps | - | 116.24 | 115.21 | 53.24 | - | - | Soil Conditioner (083) | ✓ |
| Garlic Residue | - | 33.34 | - | 10.06 | - | - | Sorted for Resale (011) | ✓ |
| Grade-B Noodle Scraps | - | 1,169.78 | 823.00 | 347.91 | - | - | Animal Feed (084) | ✓ |
| Grade-C Noodle Scraps | - | 290.34 | 136.92 | 155.04 | - | - | Animal Feed (084) | ✓ |
| Baked Noodle Scraps | - | - | - | 145.04 | - | - | Animal Feed (084) | ✓ |
| Snack Scraps | - | - | - | 134.37 | - | - | Animal Feed (084) | ✓ |
| Used Cooking Oil | - | 0.4 | 13.56 | 20.01 | - | - | Biodiesel Production (049) | ✓ |
| Grease and Fat Scraps from Grease Traps | - | 813.62 | 980.09 | 301.84 | - | - | Other Recovery (049) | ✓ |
| Waste Paper / Paper Packaging | - | 318.4 | 257.60 | 363.82 | - | 79.87 | Sorted for Resale (011) | ✓ |
| Plastic Packaging / Plastic Scraps | - | 1,007.07 | 466.94 | 551.54 | - | 89.61 | Sorted for Resale (011) | ✓ |
Non-Hazardous Waste Generation 2
| Waste type | Head office | Chonburi | Lamphun | Rayong | Ratchaburi Plant 1 | Ratchaburi Plant 2 | Management method | Responsible Party: |
|---|---|---|---|---|---|---|---|---|
| Used Oil Filter Paper | - | - | 34.62 | - | - | - | Sorted for Resale (011) | ✓ |
| Coal Ash (Cement Raw Material) | - | - | - | - | 271.05 | 46.60 | Cement Kiln Raw Material (044) | ✓ |
| Coal Ash (Fertilizer Production) | - | - | - | - | - | 122.40 | Organic Fertilizer Production (083) | ✓ |
| Zinc Scraps, Iron Scraps / Metal Packaging | - | 6.36 | 38.14 | 52.73 | 14.12 | 12.45 | Sorted for Resale (011) | ✓ |
| Wastewater Treatment Sludge (Composting) | - | - | 54.39 | - | 68.94 | 5.60 | Organic Fertilizer Production (083) | ✓ |
| Wastewater Treatment Sludge (Biogas) | - | 92.38 | - | 206.07 | - | - | Biological Treatment, Biogas (062) | ✓ |
| Cleaning Sludge | - | - | - | 311.55 | - | - | Soil Conditioner (083) | ✓ |
| Cleaning Sludge (Incineration) | - | - | 389.88 | - | - | - | Incineration in Dedicated Kiln (074) | ✓ |
| Sludge (Biological Treatment, Biogas) | - | 614.83 | - | 270.24 | - | - | Biological Treatment, Biogas (062) | ✓ |
| Wood Packaging / Wood Pallet Scraps | - | 2.7 | 15.86 | 7.19 | - | - | Sorted for Resale (011) | ✓ |
| Glass Packaging | - | - | - | - | - | 0.5 | Sorted for Resale (011) | ✓ |
| Concrete waste | - | - | 56.23 | - | - | - | Infilling of low-lying areas using only non-hazardous waste (082) | ✓ |
| resin | - | 0.8 | 0.71 | - | - | 1.79 | Fuel blending (042) | ✓ |
| Filter sand | - | - | - | 8.92 | 0.2 | - | Other Recovery (049) | ✓ |
| Fine water filter | - | - | 0.27 | - | - | - | Fuel blending (042) | ✓ |
| Plastic pallets | - | 14.95 | 5.14 | 17.28 | - | - | Sorted for Resale (011) | ✓ |
Non-Hazardous Waste Generation 3
| Waste type | Head office | Chonburi | Lamphun | Rayong | Ratchaburi Plant 1 | Ratchaburi Plant 2 | Management method | Responsible Party: |
|---|---|---|---|---|---|---|---|---|
| Non-conforming products | - | - | - | 19.77 | - | - | Alternative fuel for kilns (047) | ✓ |
| Non-conforming raw materials (incineration) | - | - | 0.51 | - | 0 | 0 | Incineration in Dedicated Kiln (074) | ✓ |
| Non-conforming raw materials (composting) | - | - | - | 1.12 | 0 | 0.78 | Soil Conditioner (083) | ✓ |
| Insulating firebricks | - | - | - | - | 0 | 5.86 | Reuse (039) | ✓ |
| Total (tonnes) | 0.00 | 4,988.36 | 4,104.51 | 3,748.71 | 741.30 | 825.91 | ||
Hazardous Waste Generation
| Waste type | Head office | Chonburi | Lamphun | Rayong | Ratchaburi Plant 1 | Ratchaburi Plant 2 | Management method | Responsible Party: |
|---|---|---|---|---|---|---|---|---|
| Fluorescent lamps | - | 0.29 | 0.33 | 0.44 | 0.15 | 0.23 | Other Recovery (049) | ✓ |
| Chemical-contaminated containers | - | 0.76 | 0.00 | - | 1.39 | 1.96 | Other Recovery (049) | ✓ |
| Contaminated containers (fuel blending) | - | - | 0.05 | 0.40 | - | - | Fuel blending (042) | ✓ |
| Contaminated containers (return to vendor) | - | 0.69 | - | 1.88 | - | - | Return to vendor (033) | ✓ |
| Paint cans and aerosol cans | - | 0.15 | 0.13 | 0.28 | - | - | Other Recovery (049) | ✓ |
| Batteries and dry cells | - | 0.02 | - | - | 0.18 | 0.55 | Other Recovery (049) | ✓ |
| Chemical-contaminated rags | - | 0.05 | 0.48 | - | 3.84 | 2.52 | Fuel blending (042) | ✓ |
| Contaminated absorbent sand | - | - | - | - | 0.14 | 0.10 | Fuel blending (042) | ✓ |
| Glass wool insulation | - | 0.18 | 0.28 | - | 0.05 | 0.15 | Cement raw materials (044) / fuel blending (042) | ✓ |
| Electronic equipment | - | - | - | - | 0.05 | 0.05 | Other Recovery (049) | ✓ |
| Used lubricating oil | - | 0.05 | 0.16 | - | 1.28 | 2.06 | Fuel blending (042) | ✓ |
| Toner cartridges and ribbons | - | 0.22 | 2.50 | 1.05 | 1.00 | 0.50 | Fuel blending (042) | ✓ |
| Office supplies | - | - | - | 0.09 | 0.05 | 0.05 | Fuel blending (042) | ✓ |
| Carbon paper | - | - | - | - | 0.02 | - | Fuel blending (042) | ✓ |
| Total (tonnes) | 0 | 2.406 | 3.92 | 4.14 | 9.15 | 9.06 | ||
Corporate Water Consumption
Unit: Cubic meters (\text{m}^3)
| areas | Water consumption | Corporate water consumption (cubic meters) | |||
|---|---|---|---|---|---|
| 2022 | 2023 | 2024 | 2568 | ||
| Head Office | Municipal water consumption | 8,560 | 7,296 | 6,690 | 7,353 |
| Chonburi Plant | Raw water consumption | 144,292 | 134,883 | 143,365 | 149,541 |
| Quarry water collection | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Lamphun Plant | Municipal water consumption | 0 | 0 | 0 | 0 |
| Groundwater withdrawal volume | 60,503 | 83,251 | 86,501 | 81,355 | |
| Quarry water collection | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Rayong Plant | Municipal water consumption | 56,126 | 51,405 | 59,624 | 60,828 |
| Natural water source consumption | 150,876 | 109,934 | 99,587 | 86,824 | |
| Quarry water collection | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Ratchaburi Plant 1 | Groundwater withdrawal volume | 139,648 | 119,352 | 121,165 | 117,081 |
| Quarry water collection | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Ratchaburi Plant 2 | Groundwater withdrawal volume | 326,089 | 320,087 | 276,048 | 258,411 |
| Quarry water collection | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| total | Municipal water consumption | 64,686 | 58,701 | 66,314 | 68,181 |
| total | Groundwater withdrawal volume | 526,240 | 522,690 | 483,714 | 456,847 |
| total | Natural water source consumption | 295,168 | 244,817 | 242,952 | 236,365 |
| total | Total water consumption | 886,094 | 826,208 | 792,980 | 761,393 |
| total | Quarry water collection | 0 | 0 | 0 | 0 |
| total | Harvested rainwater | 0 | 0 | 0 | 0 |
| total | Seawater | 0 | 0 | 0 | 0 |
Wastewater Discharge Volume
| areas | Average wastewater discharge volume per month (ML) | BOD (≤20 mg/L) | COD (≤120 mg/L) | pH (5.5–9.0) | Discharge area |
|---|---|---|---|---|---|
| Head Office | 0 | 0 | 0 | 0 | Discharged to Bangkok Metropolitan Administration (BMA) |
| Chonburi Plant | 11.32 | 28.3 | 165.7 | 7.6 | Discharged to the SPI wastewater treatment system |
| Lamphun Plant | 9.42 | 14.08 | 62.33 | 7.87 | Discharged to the SPI wastewater treatment system |
| Rayong Plant | 8.54 | 10.46 | 62.42 | 7.8 | Retained on-site for internal reuse (landscape irrigation and road cleaning) |
| Ratchaburi Plant 1 | 6.88 | 3.08 | 79.33 | 7.8 | Discharged to Pak Raet subdistrict public waterway |
| Ratchaburi Plant 2 | 13.59 | 1.42 | 65.5 | 7.5 | Retained on-site for internal reuse (landscape irrigation and road cleaning) |
| total | 49.75 | — | — | — |
Wastewater Discharge Destinations
Unit: Megaliters per month (ML/month)
| areas | Discharged to the ocean | Discharged to surface water bodies | Discharged to groundwater/underground aquifers | Discharged to an external wastewater treatment system | Utilized on-site for internal reuse | remark: |
|---|---|---|---|---|---|---|
| Head Office | - | - | - | - | - | Discharged to the BMA public drainage system with zero discharge to oceans or natural water bodies |
| Chonburi Plant | - | - | - | 11.32 | - | Discharged to the SPI central wastewater treatment system |
| Lamphun Plant | - | - | - | 9.42 | - | Discharged to the SPI central wastewater treatment system |
| Rayong Plant | - | - | - | - | 8.54 | Retained on-site for internal reuse (landscape irrigation, road cleaning, and non-potable sanitation) |
| Ratchaburi Plant 1 | - | 6.88 | - | - | - | Discharged to local public waterways |
| Ratchaburi Plant 2 | - | - | - | - | 13.59 | Retained on-site for internal reuse (landscape irrigation and road cleaning) |
| total | - | 6.88 | - | 20.74 | 22.13 |
Percentage of water withdrawal in water-stressed areas
| Key Performance Indicators (KPIs) | year | Value | Unit |
|---|---|---|---|
| Water withdrawal in water-stressed areas | 2568 | 0 | % |
The Company does not withdraw water from high water-stress areas, resulting in a 0% water withdrawal rate in water-stressed areas for 2025.