Performance results
Water Consumption Reduction Summary
Through the continuous implementation of the Green Process Policy, the Company has consolidated the results of its water-use reduction initiatives across all operational dimensions, as summarized below:
| Water Management Strategy | Project Scope and Key Measures | Outcomes and Benefits |
|---|---|---|
|
1. Water Reduction at Source
Focusing on improving machinery and operational practices to reduce water consumption while enhancing cleanliness. |
• High-Pressure Water:
Replaced conventional water hoses with high-pressure water cleaners in the noodle production line.
• Spray Nozzles: Replaced perforated pipes with spray nozzles on rice noodle conveyor belts and filtration systems. • Automated Systems: Installed roller soaking tanks to replace continuous water spraying, along with an automatic screen-washing system. |
Reduce water consumption per unit of product
31.1%
Reduced Cleaning Time Reduction in wastewater sent for treatment. |
| 2. Water Recirculation and Reuse |
• Reused treated wastewater for applications such as watering green areas, toilet flushing, and use in odor control towers.
• Reused wastewater from the RO and water treatment systems for water production. • Recovered condensate from production lines and returned it to the boiler system. |
Reduction in freshwater withdrawal from natural sources
Reduced Tap Water and Groundwater Consumption Reduced Energy Consumption |
| 3. Continuous Efficiency Improvement |
• Monitored water consumption by type and wastewater treatment system performance on a monthly basis.
• Expanded successful practices from the pilot factory to other factories. • Plan to upgrade water-saving equipment for the rice noodle steamer at Ban Pong 1 Factory. |
Database for Analysis
• Standardizing practices to ensure operational consistency across all plants. |
Water Withdrawal by Source Over the Past 3 Years
Summary of Water Withdrawal by Source Type for 2023–2025
Head Office and 5 Manufacturing Facilities
| Water Source |
2023
Two Years Prior |
2024
One Year Prior |
2025
lastest year |
Data Scope |
|---|---|---|---|---|
| Surface Water | 244,817 | 242,952 | 236,365 | Head Office and 5 Manufacturing Facilities |
| Groundwater | 522,690 | 483,714 | 456,847 | Head Office and 5 Manufacturing Facilities |
| Quarry Water | 0 | 0 | 0 | Head Office and 5 Manufacturing Facilities |
| Municipal Water Supply | 58,701 | 66,314 | 68,181 | Head Office and 5 Manufacturing Facilities |
| External Wastewater | 0 | 0 | 0 | Head Office and 5 Manufacturing Facilities |
| Harvested rainwater | 0 | 0 | 0 | Head Office and 5 Manufacturing Facilities |
| Seawater | 0 | 0 | 0 | Head Office and 5 Manufacturing Facilities |
| Total Water Withdrawal | 826,208 | 792,980 | 761,393 | Head Office and 5 Manufacturing Facilities |
| areas | Type of Water Use | Water Consumption (m³) | |||
|---|---|---|---|---|---|
| 2022 | 2023 | 2024 | 2025 | ||
| Head Office | Municipal Water Supply | 8,560 | 7,296 | 6,690 | 7,353 |
| Chonburi Plant | Raw Water | 144,292 | 134,883 | 143,365 | 149,541 |
| Quarry Water | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Lamphun Plant | Municipal Water Supply | 0 | 0 | 0 | 0 |
| Groundwater | 60,503 | 83,251 | 86,501 | 81,355 | |
| Quarry Water | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Rayong Plant | Municipal Water Supply | 56,126 | 51,405 | 59,624 | 60,828 |
| Water from Natural Sources | 150,876 | 109,934 | 99,587 | 86,824 | |
| Quarry Water | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Ratchaburi Plant 1 | Groundwater | 139,648 | 119,352 | 121,165 | 117,081 |
| Quarry Water | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| Ratchaburi Plant 2 | Groundwater | 326,089 | 320,087 | 276,048 | 258,411 |
| Quarry Water | 0 | 0 | 0 | 0 | |
| Harvested rainwater | 0 | 0 | 0 | 0 | |
| Seawater | 0 | 0 | 0 | 0 | |
| total | Municipal Water Supply | 64,686 | 58,701 | 66,314 | 68,181 |
| total | Groundwater | 526,240 | 522,690 | 483,714 | 456,847 |
| total | Surface Water / Natural Water Sources | 295,168 | 244,817 | 242,952 | 236,365 |
| total | Total water consumption | 886,094 | 826,208 | 792,980 | 761,393 |
Wastewater Discharge Volume, Quality, and Destination Over the Past 3 Years
Monthly Average Wastewater Discharge Volume, Wastewater Quality, and Discharge Destination for 2023–2025
| areas | Average Wastewater Discharge per Month (ML) |
BOD (mg/L) |
COD (mg/L) |
pH | Wastewater Discharge Destination |
|---|---|---|---|---|---|
| Head Office | 0 | 0 | 0 | 0 | Discharged into the Bangkok Metropolitan Administration (BMA) Public Sewerage System |
| Chonburi Plant | 11.32 | 28.3 | 165.7 | 7.6 | Discharged to the SPI central wastewater treatment system |
| Lamphun Plant | 9.42 | 14.08 | 62.33 | 7.87 | Discharged to the SPI central wastewater treatment system |
| Rayong Plant | 8.54 | 10.46 | 62.42 | 7.8 | Retained on-site for internal reuse (landscape irrigation, road cleaning, and non-potable sanitation) |
| Ratchaburi Plant 1 | 6.88 | 3.08 | 79.33 | 7.8 | Discharged into the Public Drainage Canal in Pak Raet Subdistrict |
| Ratchaburi Plant 2 | 13.59 | 1.42 | 65.5 | 7.5 | Retained on-site for internal reuse (landscape irrigation, road cleaning, and non-potable sanitation) |
| total | 49.75 | - | - | - |
** The Chonburi and Lamphun factories discharge wastewater into the centralized wastewater treatment system of Saha Group Industrial Park.
| areas | Average Wastewater Discharge per Month (ML) |
BOD (mg/L) |
COD (mg/L) |
pH | Wastewater Discharge Destination |
|---|---|---|---|---|---|
| Head Office | - | - | - | - | Discharged into the Bangkok Metropolitan Administration (BMA) Public Sewerage System |
| Chonburi Plant | 7.41 | 14.20 | 74.60 | 7.5 | Discharged to the SPI central wastewater treatment system |
| Lamphun Plant | 9.63 | 17.50 | 83.30 | 7.7 | Discharged to the SPI central wastewater treatment system |
| Rayong Plant | 7.31 | 6.06 | 49.00 | 7.5 | Stored and Reused Within the Factory |
| Ratchaburi Plant 1 | 7.24 | 4.33 | 54.42 | 8.0 | Discharged into the Public Drainage Canal in Pak Raet Subdistrict |
| Ratchaburi Plant 2 | 15.11 | 1.83 | 48.17 | 7.5 | Stored and Reused Within the Factory |
| total | 46.70 | - | - | - |
| areas | Average Wastewater Discharge per Month (ML) |
BOD (mg/L) |
COD (mg/L) |
pH | Wastewater Discharge Destination |
|---|---|---|---|---|---|
| Head Office | - | - | - | - | Discharged into the Bangkok Metropolitan Administration (BMA) Public Sewerage System |
| Chonburi Plant | 8.83 | 12.98 | 88.59 | 7.72 | Discharged to the SPI central wastewater treatment system |
| Lamphun Plant | 6.56 | 11.42 | 59.00 | 8.00 | Discharged to the SPI central wastewater treatment system |
| Rayong Plant | 7.69 | 7.40 | 40.75 | 7.54 | Stored and Reused Within the Factory |
| Ratchaburi Plant 1 | 6.86 | 5 | 58 | 8.0 | Discharged into the Public Drainage Canal in Pak Raet Subdistrict |
| Ratchaburi Plant 2 | 11.44 | 2 | 31 | 7.8 | Stored and Reused Within the Factory |
| total | 41.38 | - | - | - | Calculated from the Aggregated Data of All Locations |
Water Discharge by Destination Over the Past 3 Years
Summary of Wastewater Discharge by Destination Based on Manufacturing Facility Data for 2023–2025
Covers 5 manufacturing facilities: Chonburi, Lamphun, Rayong, Ratchaburi 1, and Ratchaburi 2.
| Water Discharge Destination |
2023
Two Years Prior |
2024
One Year Prior |
2025
lastest year |
Data Scope |
|---|---|---|---|---|
| Ocean | 0.00 | 0.00 | 0.00 | 5 Manufacturing Facilities |
| Surface Water Sources | 6.86 | 7.24 | 6.88 | 5 Manufacturing Facilities |
| Subsurface / Groundwater Wells | 0.00 | 0.00 | 0.00 | 5 Manufacturing Facilities |
| External Wastewater Treatment System | 15.39 | 17.04 | 20.74 | 5 Manufacturing Facilities |
| Utilized on-site for internal reuse | 19.13 | 22.42 | 22.13 | 5 Manufacturing Facilities |
| Total Wastewater Discharge Volume | 41.38 | 46.70 | 49.75 | 5 Manufacturing Facilities |
Discharge Destination Classification: Chonburi and Lamphun Factories = External Wastewater Treatment System; Ratchaburi 1 Factory = Surface Water; Rayong and Ratchaburi 2 Factories = Reused Within the Factory.
| areas | Ocean | Surface Water Sources | Subsurface / Groundwater Wells | External Wastewater Treatment System | Reused for Beneficial Purposes | remark: |
|---|---|---|---|---|---|---|
| Head Office | - | - | - | - | - | Discharged into the Bangkok Metropolitan Administration (BMA) sewerage system; wastewater discharge volume is not measured. |
| Chonburi Plant | - | - | - | 11.32 | - | Discharged to the SPI central wastewater treatment system |
| Lamphun Plant | - | - | - | 9.42 | - | Discharged to the SPI central wastewater treatment system |
| Rayong Plant | - | - | - | - | 8.54 | Stored and Reused Within the Factory |
| Ratchaburi Plant 1 | - | 6.88 | - | - | - | Discharged into a Public Drainage Canal |
| Ratchaburi Plant 2 | - | - | - | - | 13.59 | Stored and Reused Within the Factory |
| total | - | 6.88 | - | 20.74 | 22.13 |
Percentage of water withdrawal in water-stressed areas
| Key Performance Indicators (KPIs) | year | Value | Unit |
|---|---|---|---|
| Water withdrawal in water-stressed areas | 2568 | 0 | % |
The Company does not withdraw water from areas with high water scarcity risk. As a result, water use in water-stressed areas was 0% in 2025.